TSBU-200M is used for exploratory rotational drilling of vertical and sloping wells in hard-to-reach mountain-taiga areas at any time of the year at a temperature of 40 degrees C - 40 degrees C.
The installation is mounted on a special frame-base, fortified on the basis of the MCH-4 skiding machine or a tractor of forestry TL-5ALM/TL-5ALM-01.
All equipment is located in the drilling salon, taking into account safety rules in the conduct of exploration. When transporting the mast is located along the longitudinal axis of the installation. Lifting the mast from the transport position and back is made by hydraulics in two stages. Hydrodomcrats raise the middle part of the mast and fasten it to the base. Then lift the top until the snaps are fixed with the middle part. Installation of the mast for sloping drilling is done by hand, and from the sloped position to the vertical - hydro-double. The hydraulic control is located on the base of the mast in the cabin. The pipe is attached to a special frame that ensures that it is installed at the necessary angle of inclination. To remove the load from the chassis of the tractor during drilling, three screw jacks are provided.